Date: | Friday 4 December 2015 |
Time: | 19:15 |
Type: | de Havilland Canada DHC-8-402Q Dash 8 |
Owner/operator: | SpiceJet |
Registration: | VT-SUC |
MSN: | 4377 |
Year of manufacture: | 2011 |
Total airframe hrs: | 11928 hours |
Cycles: | 11214 flights |
Engine model: | Pratt & Whitney Canada PW150A |
Fatalities: | Fatalities: 0 / Occupants: 53 |
Aircraft damage: | Substantial |
Category: | Accident |
Location: | Jabalpur Airport (JLR) -
India
|
Phase: | Landing |
Nature: | Passenger - Scheduled |
Departure airport: | Mumbai-Chhatrapati Shivaji International Airport (BOM/VABB) |
Destination airport: | Jabalpur Airport (JLR/VAJB) |
Investigating agency: | AAIB India |
Confidence Rating: | Accident investigation report completed and information captured |
Narrative:A DHC-8-400 operated by SpiceJet sustained damage in a landing accident at Jabalpur Airport (JLR), India.
The aircraft took-off from Mumbai for Jabalpur at around 12:00 UTC. The enroute part of the flight was uneventful. ATC Jabalpur cleared the aircraft for landing on runway 06. The aircraft landed on runway 06 and a few seconds after touch down at around 13:52 UTC the aircraft hit wild boars on the runway. One of the wild boars impacted the left hand main landing gear, causing it to collapse. The aircraft started drifting towards left of the runway. Thereafter the aircraft exited the runway on the left side and entered into soft ground. All the passengers were evacuated safely from the right hand side. There was no injury to any
of the occupants and there was no fire.
Probable cause of the accident: "The aircraft during its landing roll had a wild life (Wild Boars) strike on the runway, resulting in collapse of left main landing gear and subsequently the aircraft veered to the left of the runway.
Contributory factor:
The presence of wild life in the operational area and the runway was due to several breaches in the boundary wall."
Accident investigation:
|
| |
Investigating agency: | AAIB India |
Report number: | Final report |
Status: | Investigation completed |
Duration: | 1 year and 7 months |
Download report: | Final report |
|
Sources:
Images:
photo (c) AAIB India; Jabalpur Airport (JLR); 04 December 2015
photo (c) AAIB India; Jabalpur Airport (JLR); 04 December 2015
Revision history:
Date/time | Contributor | Updates |