Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-008 |
A complete flight course planning was needed prior to perform an aerial photography mission; No mission shall be carried out if it is not adequately planned. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-009 |
Implement relevant regulations and actual performance preparation prior to aerial photography mission, including: verify the approval of the aerial photography plan, timing and flight course planning participants, safety precautions of flight course planning, aircraft performance and safety consideration of single-engine malfunction, evaluate the necessity of examining surrounding ground obstacles within aerial photography area at safety altitude, required chart information, weather information and concrete items and recording methods of flight course planning. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-010 |
Implement integration and application of relevant aerial photography area chart information to assist pilots and aerial photographers to acknowledge the information of geography, ground obstacles altitude, distance between measuring lines and ground obstacles. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-011 |
Implement internal control to ensure that all pilot trainings are planned according to the Flight Crew Training Manual. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-012 |
Implement pilots flight route training and check to meet flight route and aerial photography missions requirement. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-013 |
Examine the qualification of route check examiner and ensure the qualification is in accordance with the regulations. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-014 |
Implement internal control mechanism regarding to pilots fight hours, training and inspection of relevant record management to improve the integrity and accuracy of records. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-015 |
Implement aerial photographers training regulations and establish training items specific to their responsibilities and keep training records. |
Issued: 12-SEP-2013 | To: Dapeng Airlines | ASC-ASR-13-09-016 |
Ensured aircraft maintenance record filled and kept in accordance with the regulations. |
Issued: 12-SEP-2013 | To: Aerospace Industrial Development Corporation | ASC-ASR-13-09-017 |
Ensured maintenance personnel perform aircraft maintenance according to the the operation standard, reinforce Quality Check personnels inspection to ensure aircraft maintenance quality. |
Issued: 12-SEP-2013 | To: CAA Taiwan | ASC-ASR-13-09-018 |
Supervised the operator and other general aviation operators preparation of aerial photography missions, personnels training, and pilots records management. |
Issued: 12-SEP-2013 | To: CAA Taiwan | ASC-ASR-13-09-019 |
Re-examine the feasibility of performing general aviation operator flight route check when performing an aerial photography mission. |
Issued: 12-SEP-2013 | To: CAA Taiwan | ASC-ASR-13-09-020 |
Re-examine the feasibility for general aviation operators to implement Annex 6 of Aircraft Flight Operation Regulations. |
Issued: 12-SEP-2013 | To: CAA Taiwan | ASC-ASR-13-09-021 |
Produce visual flight chart in accordance with ICAO standard to assist the operator to produce visual flight plans and visual flight operation. |
Issued: 12-SEP-2013 | To: CAA Taiwan | ASC-ASR-13-09-022 |
Study the feasibility of installing simple flight recorder system to facilitate monitoring of flight missions and occurrence investigation of national general aviation industry. |
Issued: 12-SEP-2013 | To: Office of Disaster Management | ASC-ASR-13-09-023 |
Re-examine and coordinate the amendments of the emergency procedures in Operation Plan of Air Disaster Management, especially the related organization authorization and responsibilities of searching operation. |