ASN Wikibase Occurrence # 45758
This information is added by users of ASN. Neither ASN nor the Flight Safety Foundation are responsible for the completeness or correctness of this information.
If you feel this information is incomplete or incorrect, you can
submit corrected information.
Date: | Sunday 26 August 2001 |
Time: | 20:30 |
Type: | Cessna 172S Skyhawk SP |
Owner/operator: | Esquire Aviation Inc. |
Registration: | N629PD |
MSN: | 172S8368 |
Year of manufacture: | 2000 |
Total airframe hrs: | 469 hours |
Engine model: | Lycoming IO-360 |
Fatalities: | Fatalities: 2 / Occupants: 2 |
Aircraft damage: | Substantial |
Category: | Accident |
Location: | Matawan, NJ -
United States of America
|
Phase: | Take off |
Nature: | Private |
Departure airport: | Marlboro, NJ (2N8) |
Destination airport: | |
Investigating agency: | NTSB |
Confidence Rating: | Accident investigation report completed and information captured |
Narrative:During nighttime conditions, the airplane approached runway 09, a 2,156-foot long, 50-foot wide, asphalt runway. The airplane touched down near the opposite end of the runway, almost on the numbers "27." The engine then revved, and the airplane initially climbed, but it turned left and struck transmission wires. The tower that supported the transmission wires was approximately 133 feet tall, and unlighted. It was located adjacent to the runway, about 1,260 feet northeast of the departure end of runway 09. Additionally, there 56-foot tall transmission wires located approximately 860 feet beyond the departure end of the runway, and perpendicular to it. However, review of an Information Manual for the make and model airplane revealed sufficient horizontal distance remained for the airplane to climb above those wires. The pilot obtained his private pilot certificate 4 days prior to the accident. According to his logbook, the pilot had a total flight experience of 87 hours, of which, about 12 hours were in the same make and model as the accident airplane. The pilot also had a total nighttime flying experience of approximately 5 hours. The reported wind about 5 minutes after the accident, at an airport about 10 miles southeast of the accident site was from 210 degrees at 8 knots.
Probable Cause: The pilot's failure to maintain runway alignment during the initial climb. Factors were the pilot's failure to perform a go-around, the pilot's lack of flight experience in nighttime conditions, the nighttime conditions, and a tailwind.
Accident investigation:
|
| |
Investigating agency: | NTSB |
Report number: | NYC01FA217 |
Status: | Investigation completed |
Duration: | |
Download report: | Final report |
|
Sources:
NTSB:
https://www.ntsb.gov/_layouts/ntsb.aviation/brief.aspx?ev_id=20010904X01857&key=1 Location
Revision history:
Date/time | Contributor | Updates |
28-Oct-2008 00:45 |
ASN archive |
Added |
21-Dec-2016 19:24 |
ASN Update Bot |
Updated [Time, Damage, Category, Investigating agency] |
10-Dec-2017 12:22 |
ASN Update Bot |
Updated [Operator, Source, Narrative] |
The Aviation Safety Network is an exclusive service provided by:
CONNECT WITH US:
©2024 Flight Safety Foundation